Close
Current temperature in Boston - 62 °
BECOME A MEMBER
Get access to a personalized news feed, our newsletter and exclusive discounts on everything from shows to local restaurants, All for free.
Already a member? Sign in.
The Bay State Banner
BACK TO TOP
The Bay State Banner
POST AN AD SIGN IN

Trending Articles

Rudy Edwards Jr., basketball player, firefighter, doing what he loved

Gloria Fox, activist, former Mass. state rep. has died at 82

What’s next? Boston thought leaders debrief on the presidential election

READ PRINT EDITION
For Rent

HARRISON ALBANY BLOCK (THE SMITH – PHASE 2)

Affordable Housing

BPDA Income-Restricted Rental Opportunity
HARRISON ALBANY BLOCK (THE SMITH – PHASE 2)
89 East Dedham Street, South End, MA 02118

30 INCOME-RESTRICTED RENTAL UNITS
# of Units | # of Bedrooms | Estimated Square Feet | Rent | Maximum Income Limit (% AMI) | # of units built out for Mobility impairments | # of units built out for Deaf/Hard of Hearing
6 | Studio | 492 | $1,330 | 70% | 1 | –
16 | 1-Bedroom | 538 | $1,559 | 70% | 2 | 1
7 | 2-Bedroom | 1,095 | $1,766 | 70% | 2 | –
1 | 3-Bedroom | 1,337 | $1,978 | 70% | 1 | –

Minimum Incomes
(set by owner + based on # of bedrooms + Area Median Income (AMI))
# of Bedrooms Minimum Income 70% AMI
Studio $39,900
1-Bedroom $46,770
2-Bedroom $52,980
3-Bedroom $59,340

Maximum Incomes
(set by BPDA + based on household size + Area Median Income (AMI))
Household Size Maximum Income 70% AMI
1 $72,730
2 $83,160
3 $93,520
4 $103,880
5 $112,210
6 $120,540
***Minimum incomes do not apply to households receiving housing assistance such as Section 8, MRVP, or VASH.

Maximum Asset Limits
70% AMI
$75,000
Does not include retirement. Does include Real Estate.

Applications are available for 17 days, from Monday, July 17, 2023 — Wednesday, August 2, 2023.

To request an application online, please visit www.TheSmithLottery.com. To have a hard copy of the application mailed to your mailing address, please call (617) 531-7123 Ext 787 | US Relay 711 or email TheSmith@MaloneyProperties.com

Applications are available in person on the following days, dates, and times in the following place(s)
Day | Date | Time | Location
Thursday | July 20, 2023 | 3 PM – 7 PM | BPL – Central Branch in Copley Square, 700 Boylston Street, Back Bay, Mezzanine Conference Room 3
Saturday | July 22, 2023 | 10 AM – 2 PM | BPL – Central Branch in Copley Square, 700 Boylston Street, Back Bay, Mezzanine Conference Room 3
Thursday | July 27, 2023 | 3 PM – 7 PM | BPL – Central Branch in Copley Square, 700 Boylston Street, Back Bay, Mezzanine Conference Room 3
Saturday | July 29, 2023 | 10 AM – 2 PM | BPL – Central Branch in Copley Square, 700 Boylston Street, Back Bay, Mezzanine Conference Room 3

DEADLINE: Applications must be submitted online or postmarked no later than Wednesday, August 2, 2023
MAILED TO: Maloney Properties, Inc, Attn: The Smith, Phase 2 Lottery, 27 Mica Lane, Wellesley, MA 02481

  • Selection by Lottery. Asset & Use Restrictions Apply.
  • Preference for Boston Residents.
  • Preference for Households with at least 1 person per bedroom.
  • Preference for Households with Mobility Impairments and/or that are Deaf/Hard of Hearing for accessible units.

For more information, free language assistance, or reasonable accommodations for persons with disabilities, please call (617) 531-7123 Ext 787 | US Relay 711 or email TheSmith@MaloneyProperties.com

For more on BPDA program eligibility, please visit http://www.bostonplans.org/housing/faqs

Equal Housing Opportunity

89 East Dedham St, Boston, MA 02118