Close
Current temperature in Boston - 62 °
BECOME A MEMBER
Get access to a personalized news feed, our newsletter and exclusive discounts on everything from shows to local restaurants, All for free.
Already a member? Sign in.
The Bay State Banner
BACK TO TOP
The Bay State Banner
POST AN AD SIGN IN

Trending Articles

Former 1090 WILD-AM director Elroy Smith to host reunion for some of Boston’s best radio personalities

Breaking new ground: Break dancing debuts as sport at 2024 Paris Olympics

Roxbury affordable housing development goes fully electric — even when the power goes out

READ PRINT EDITION

Solicitation for Engineering and Technical Support Consultancy Services for Climate Change Vulnerability Assessment and Adaptation

PUBLIC ANNOUNCEMENT

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

SOLICITATION FOR CONSULTANT SERVICES

FEDERALLY-FUNDED PROJECTS

The Massachusetts Bay Transportation Authority is soliciting Engineering and Technical Support Consultancy Services for Climate Change Vulnerability Assessment and Adaptation. The amount of $3,000,000, with $1,000,000 available for each of the three consultants selected, has been budgeted for this project.

The Department of Energy and Environment is in need of on-call, task order-based climate change vulnerability assessment and adaptation services. Through task order contracts, services may include advice to and consultation with, the MBTA’s Director of Energy and Environment and Climate Change Resiliency Specialist on (1) a system-wide vulnerability assessment; (2) multidiscipline engineering services (i.e. mechanical, electrical, energy, civil, etc.) to design (and potentially construct) climate change resiliency measures for physical infrastructure, (3) policy and planning support for improving resiliency of the MBTA’s policies and administrative processes, (4) climate change risk and resiliency communications for both internal and external audiences, and (5) other activities that may assist the MBTA in building internal capacity to minimize climate change risk.

This contract will be Federally Funded. The DBE Participation Goal for this contract will be 1.0%.

The complete request for qualifications can be found on the MBTA website. Please use the following link:

This is not a request for proposal. The MBTA reserves the right to cancel this procurement or to reject any or all Statements of Qualifications.