Close
Current temperature in Boston - 62 °
BECOME A MEMBER
Get access to a personalized news feed, our newsletter and exclusive discounts on everything from shows to local restaurants, All for free.
Already a member? Sign in.
The Bay State Banner
BACK TO TOP
The Bay State Banner
POST AN AD SIGN IN

Trending Articles

Rudy Edwards Jr., basketball player, firefighter, doing what he loved

Gloria Fox, activist, former Mass. state rep. has died at 82

What’s next? Boston thought leaders debrief on the presidential election

READ PRINT EDITION

Project Code 863323 Project: North Quincy MBTA Station Garage Upgrades

Notice to Bidders

Hancock Street Partners LLC, (HSP) acting as agent of the Massachusetts Bay Transportation Authority MBTA is issuing an IFB Available 7/30/24 @ 10:00am at www.projectdog.com, Project Code 863323 Project: North Quincy MBTA Station Garage Upgrades: North head House Plaza, lighting, Bike shelter located at 189 Hancock Street, Quincy MA. pursuant to MGL c.30, 39M. Value estimate is $900,000.

Site visit will be held on 8/16/2024 @ 12:00pm (noon) at the North Headhouse of the North Quincy MBTA Station 189 Hancock Street Quincy, Ma ground level. Proposal deadline submission to is August 27, 2024 at 9:00am. All proposals shall be submitted on E-Bid online at www.Projectdog.com. HSP reserves the right to reject any or all proposals

Work consists of demolition, concrete, electrical, misc. construction

Electronic proposals for the project will be issued and received through the internet using Projectdog until the date and time stated below, and will be posted on www.Projectdog.com. No paper copies of bids will be accepted. Bidders need to apply with Projectdog at least 14 days prior to the scheduled bid opening date.