Close
Current temperature in Boston - 62 °
BECOME A MEMBER
Get access to a personalized news feed, our newsletter and exclusive discounts on everything from shows to local restaurants, All for free.
Already a member? Sign in.
The Bay State Banner
BACK TO TOP
The Bay State Banner
POST AN AD SIGN IN

Trending Articles

Former 1090 WILD-AM director Elroy Smith to host reunion for some of Boston’s best radio personalities

Breaking new ground: Break dancing debuts as sport at 2024 Paris Olympics

Roxbury affordable housing development goes fully electric — even when the power goes out

READ PRINT EDITION

MBTA CONTRACT NUMBER I62PS02

PUBLIC ANNOUNCEMENT

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
SOLICITATION FOR ARCHITECTURE/ENGINEERING AND DESIGN SERVICES FOR LYNN COMMUTER RAIL STATION AND PARKING GARAGE IMPROVEMENTS, PHASE 2

MBTA CONTRACT NUMBER I62PS02

REQUEST FOR QUALIFICATIONS

The Massachusetts Bay Transportation Authority is soliciting Architecture/Engineering and Design Service to bring Lynn Commuter Rail Station and garages elements to a State of Good Repair and extend the useful life of the facilities. The Scope of Services includes but is not limited to: Multi-disciplinary Engineering (Vertical Transportation, Structural, Electrical, Mechanical, Civil, Plumbing, Fire Protection and Geotechnical Engineering); Architecture; Landscape Architecture; Code Analysis; Constructability Review; Environmental; Permitting; Scheduling and Cost Estimating; Risk Analysis; Public Outreach and Coordination; Testing and Commissioning; Design Phase, Bid Phase, Construction Phase Services; and Project Close Out, as well as Project Management associated with each Phase. The scope of services will be authorized on a Task Order basis by phase. The conceptual level construction cost estimate for the Phase 2 proposed improvements is $22,000,000. The duration of this contract will be four (4) years, with two (2) option periods of one (1) year each.

This project is expected to utilize Federal and non-federal funding. The DBE participation goal for this project is ten percent (10%) of the total amount authorized. In addition, the Authority strongly encourages the use of Minority, Women and Disadvantaged Business Enterprises as prime consultants, sub-consultants and suppliers in all of its contracting opportunities.

The complete Request for Qualifications can be found on the MBTA website. Please see the following link:

http://bc.mbta.com/business_center/bidding_solicitations/current_solicitations/

This is not a Request for Proposal. The MBTA reserves the right to cancel this procurement or to reject any or all Statements of Qualifications.

Stephanie Pollack
MassDOT Secretary & CEO

Steve Poftak
General Manager