Close
Current temperature in Boston - 62 °
BECOME A MEMBER
Get access to a personalized news feed, our newsletter and exclusive discounts on everything from shows to local restaurants, All for free.
Already a member? Sign in.
The Bay State Banner
BACK TO TOP
The Bay State Banner
POST AN AD SIGN IN

Trending Articles

Zoning Board dismisses project to bring Roxbury birth center, nonprofit offices

Former Reebok executive creates her own clothing line

MassHealth-affiliated program aims to tackle health outcomes through food access

READ PRINT EDITION

MassDOT Rail and Transit Division Proposal

MassDOT Rail and Transit Division Proposal

Proposals (paper bids only) for the following project will be received by the Rail and Transit Division until Thurs., May 17, 2018, at 1:00 p.m. and at that time publicly opened and read at Rail and Transit Division at 10 Park Plaza, Room 4160 Boston, MA 02116-3973.

Bidders must have or register for a COMMBUYS account in order to bid on this project.

The Bidding for and award of the contract for the following project (609163) is to be in accordance with the requirements of Mass. General Laws Chapter 30 § 39M.

THE PROJECT: On the Middleboro Subdivision at MP 14.42, replace bridge over Cotley River in Taunton with a box culvert. Remove and dispose of existing steel beam bridge and supporting stone abutments. Install precast concrete box culvert with associated embankment grading, slope protection and wetland replication plantings. The Middleboro Subdivision is owned by the Commonwealth of Massachusetts, Department of Transportation, and operated and maintained by Mass Coastal Railroad. Construction cost estimate is $816,700.00.

A mandatory pre-bid meeting and site tour will be held on Thurs., May 3, 2018, at 10:30 a.m. Meet at MassDOT Highway Division Dist. 5, 1000 County St., Taunton, MA. The purpose of this meeting is to discuss the proposed work, the bidding procedures or the required contract provisions. Prospective Bidders shall bring all personal protective equipment which must be worn to access the site.

The electronic version of the contract documents is available only through the COMMBUYS website on April 27, 2018, after 2:00 p.m. EDT. Plans and contract documents will be on display and information will be available at MassDOT Rail and Transit Division office, 10 Park Plaza, Rm. 4160, Boston, MA.

Prospective Bidders must be prequalified in accordance with MBTA “Procedures Governing Classification and Rating of Prospective Bidders.” A contract award will not be made to a Contractor who is not pre-qualified by the MBTA in Class 1, General Transit, and Class 4B, Concrete Bridges, for an $816,700 contract value prior to the opening of proposals and also to a Contractor who did not attend pre-bid meeting.

MassDOT Rail and Transit Division projects are subject to the rules and regulations of the Architectural Access Board (521 CMR 1.00 et. seq.). Prospective Bidders and interested parties can access this information and more at www.COMMBUYS.com.

BY: Stephanie Pollack, Secretary and CEO, MassDOT

Astrid Glynn, Administrator, MassDOT Rail and Transit Division

SATURDAY, April 21, 2018