Close
Current temperature in Boston - 62 °
BECOME A MEMBER
Get access to a personalized news feed, our newsletter and exclusive discounts on everything from shows to local restaurants, All for free.
Already a member? Sign in.
The Bay State Banner
BACK TO TOP
The Bay State Banner
POST AN AD SIGN IN

Trending Articles

Lake Mary wins Florida’s first ever Little League World Series title

Boston Arts Festival brings fine art and local music to the waterfront

Roxbury mural immortalizes “Queen of Disco” Donna Summer

READ PRINT EDITION

Decarbonization Feasibility Study (Ph I) and Renovation (Ph II) – SUST at the Brookline Housing Authority

Brookline Housing Authority
Public Notice

Designers registered in Massachusetts are advised that applications are available for preparation of plans and specifications and construction administration for Decarbonization Feasibility Study (Ph I) and Renovation (Ph II) – SUST at the Brookline Housing Authority. The design firm must provide full basic services including investigation and initial design through preparation of contract documents, bidding, and construction contract administration. The project manager or person charged with handling this project must work for a qualified Architecture firm (within the meaning of M.G.L. Chapter 7C, Section 44) and must have Massachusetts registration.

The estimated construction cost is $To Be Determined by study
The Fee for Basic Services is $84,000 (Phase 1 fee only)

A project application and the Registration and Disclosure requirements can be obtained by logging on to the Designer Selection Network at https://dsb.formverse5.com/FORMVERSESERVER-DSB/WebApp/Login.aspx and selecting the Brookline Housing Authority and 046115. A copy of the completed application must be submitted to the Designer Selection Network by 12/20/2023 at 2:00 p.m.